Wunderbuild Feasibility Template Release Notes

  Updates and improvements to the Campbells Estimating Feasibility Template in Wunderbuild.


RELEASE NOTES

Feasibility Template — Version 1

11 November 2026
Jacob Campbell Jacob Campbell
RELEASE NOTES

Feasibility Template — Version 2

19 November 2026
Jacob Campbell Jacob Campbell
Feasibility Template — Version 1Feasibility Template — Version 2

Version 1 of the Feasibility Template went live on Wednesday 11 November 2026. It turns a short set of room measurements into a full feasibility estimate, so you can put a credible number in front of a client before the drawings are finished.

The template is built once and reused on every job. You answer a handful of questions about the build, enter measurements room by room, and the costings calculate themselves.

How it works

The takeoff drives the costings. Every priceable line in the estimate gets its quantity from a formula that reads the takeoff, so you never type a quantity into a cost line.

Enter 24 m² against Kitchen 1 m2 Area and the slab, sub-floor, insulation, plasterboard, cornice, paint, skirting and floor finish for that kitchen all price off it at once. Enter the wall lengths and the framing, linings and painting follow. Enter a door count and the door, frame, architrave, hardware and the carpentry to hang it all appear.

That is the whole idea: a few measurements per room instead of a line-by-line build-up, with the relationships between them already wired in.

What you answer once

A short set of questions at the top of the takeoff sets the shape of the whole job. Answer them first — everything downstream reads from them.

Question What it controls
New build or renovation Which scope of works prices across the estimate
Mid Range Spec / High Range Spec The finish level, which drives door, hardware, tapware and floor-finish selections
New slab to this level? Whether rooms on that level get a slab
New joists and bearers to this level? Whether they get a sub-floor and sub-floor insulation instead
New trusses to this level? Whether they get a roof structure
Wall height for this level Feeds every wall framing, lining, cornice and paint quantity
New stairs to this level? Whether a stair run prices

The slab, joist, truss, wall height and stair questions are asked per level — ground, first and second — so a two-storey job on a new slab with a timber first floor is three answers, not a rebuild of the estimate.

What you enter per room

Each room carries its own short block of takeoff lines. Tick which level the room sits on, then enter:

  • Area in m² — the single most-used figure; slab, sub-floor, ceiling, flooring and finishes all read it
  • New external wall and new internal wall, in lm — framing, linings, cornice, skirting and paint
  • Cabinetry runs, in lm — what varies by room type: island and benchtop in a kitchen, linen and bar in a living room, wardrobe, desk and bench seat in a bedroom, vanity and shaving cabinet in a wet area
  • Door counts — hinged, cavity and barn, each pulling its own door, frame, architrave, hardware and hanging labour

Wet areas take a few more: room perimeter, shower glass and shower wall lengths, and a full-height wall tile question that switches the room between floor-and-skirting tiling and floor-to-ceiling. Outdoor areas take a half-height external wall, the perimeter adjoining the house and the outer perimeter edge.

Anything you leave at zero prices nothing.

What's covered

Forty-one rooms and areas, plus four whole-of-job categories — 45 cost categories in all. Rooms you don't use stay at zero and drop out of the estimate.

Area Covered
Kitchen and pantry Kitchen 1–2, Butlers Pantry / Walk-in Pantry 1–2
Living Living Room 1–3, Dining Room 1–2
Circulation Hallway / Mudroom 1–2
Bedrooms Bedroom 1–6
Studies Study 1–2
Wet areas Ensuite 1–4, Bathroom 1–4, Powder Room 1–2, WC 1–2, Laundry
Garages Garage 1–2
Outdoor Alfresco 1–2, Patio, Balcony 1–2, Deck 1–2
Whole of job Site Setup / Preliminaries, Site Prep / Demolition, Lockup Works, External Works

Lockup Works and External Works carry the items that don't belong to a single room — cladding, render, roofing, windows and external doors on one side; site cut, spoil removal, driveways, pools and landscaping on the other.

Cost codes are already set

Every priceable line ships with its cost code attached. Cost reporting works from the first estimate, and converting a quote into a job categorises correctly without you setting anything up.

Where a line is an assembly, the codes sit on the components rather than the parent, so a single allowance still reports across the right trades.

Starting a job

  • Answer the general questions — new build or renovation, spec level, and the slab, joist, truss, stair and wall height questions for each level.
  • Tick which level each room sits on.
  • Enter the measurements for the rooms the job actually has, and leave the rest at zero.
  • Price as normal.

If a figure looks wrong, check the takeoff before the costings. Almost everything in the estimate traces back to a measurement or a question, and the quickest fix is usually there.

Version 2 moves every "is this included?" decision out of the costings and into the takeoff. Each room now has a short Template Assumptions block you answer once, and the costings follow automatically.

What's new

Change What it means for you
Template Assumptions block in every room Each room's takeoff now opens with a short set of yes/no and type questions. Answer them once and the costings switch themselves on and off.
Wall allowance in slab, sub-floor and truss areas Slab, joist and truss quantities now include the floor area taken up by the walls, so they price the real slab rather than the room's internal area.
Wall area in the per-level floor totals Total Ground, First and Second Floor Area now include wall area too, so the level totals match the slab quantities.
Replace wall linings to existing walls? A new question per room that prices re-lining, cornice and repainting on existing walls in a renovation.
Flooring Type selector in dry rooms Picks between carpet or vinyl, engineered timber, and tiles. Only the matching cost lines price.
Wet areas simplified No flooring type question — wet areas are always tiled. Toilet and bath are now switchable per room.
Garages Slab and trusses kept, joists dropped, and an epoxy coating allowance added.
Outdoor areas Alfresco and patio get a non-structural slab switch that swaps the structural slab for a tiled one. Balcony and deck get a timber decking switch — leave it blank and they are tiled.
Cost coding completed The gaps left in Version 1 are closed. Every priceable line in all 45 cost categories now carries its cost code.
Home warranty insurance and long service leave Both now price as a percentage of the estimate instead of being worked out and entered by hand.

Template Assumptions — the main change

Every room in the takeoff now ends with a TEMPLATE ASSUMPTIONS block — 41 of them, holding 179 switches in all. This is where the structural and finish decisions for that room are made. In Version 1 those decisions were buried in the costing formulas, so changing one meant editing cost lines.

A standard room carries five:

Line What it controls
Slab Included to: Room The slab / footings area for that room
Joists & Bearers Included to: Room The sub-floor area, and the R3.0 sub-floor insulation that goes with it
Trusses Included to: Room The truss area
Flooring Type - Room 1 = carpet or vinyl, 2 = engineered timber, 3 = tiles
Flooring Included to: Room The floor area that gets that finish

How to use it

  1. Answer the general questions at the top of the takeoff first — new build or renovation, spec level, and for each level whether there is a new slab, new joists and bearers, and new trusses.
  2. For each room, tick which level it sits on and enter its measurements.
  3. The Template Assumptions lines then fill themselves in. A room on a level with a new slab gets a slab quantity; a room on a level with joists gets a sub-floor quantity instead.
  4. Check the block and override anything that doesn't suit the job. Type a number straight over the calculated figure.
  5. Set a line to 0 and everything it drives disappears — the cost items and their heading both drop out of the estimate, so the client never sees an empty section.

Flooring Type is the one you will most often set by hand. It derives 1 or 2 from the spec level; type 3 over it for a tiled bedroom, hallway or living area.

Wall allowance in slab, floor and roof areas

Slab, sub-floor and truss quantities are no longer the room's internal floor area. They now add the footprint of the walls around that room, so the figure is the area you actually pour, frame or truss:

area = room m² + (external wall lm × 0.09) + (internal wall lm ÷ 2 × 0.09)

The 0.09 is a 90 mm wall. External walls are counted in full by the room they belong to. Internal walls are halved, because the room on the other side picks up the other half — so across the whole house every wall is counted exactly once.

Outdoor areas work the same way with one difference: an alfresco, patio, balcony or deck has no internal walls, so the half-height external wall takes the place of the internal wall term and is counted at the full 0.09.

Floor area totals

Under CALCULATIONS ONLY in the takeoff, Total Ground Floor Area, Total First Floor Area and Total Second Floor Area now include the same wall area. These are a true total square metre figure per level, so they add the wall area whether or not that level has a new slab or new joists.

What to expect

Slab, sub-floor, truss and sub-floor insulation quantities will come out a little higher than Version 1 on the same measurements — typically a few per cent, more on a plan with many small rooms. That is the correction, not an error.

Room-type changes

Wet areas — laundry, ensuites, bathrooms, powder rooms, WCs

Wet areas are always tiled, so the Flooring Type question has been removed from all 13 of them and Flooring Included to: is now Tile Flooring Included to:. Two new switches replace what used to be fixed:

  • Toilet Included drives the toilet suite allowance, the cistern cock and the toilet roll holder.
  • Bath Tub Included(ensuites and bathrooms only) drives the freestanding bath allowance, the in-wall mixer and the wall-mounted spout.

The Full Height Wall Tiles question is left blank on purpose — enter 1 yourself where the client wants full-height tiling.

Garages

The joists and bearers question is gone; a garage is always on a slab. Slab and trusses stay as they are. Flooring Included has become Epoxy Coating Included to: Garage, which prices on a high-range spec and deducts the cabinetry run so you aren't coating under the cupboards. The Flooring Type line is kept at Epoxy = 1 so other floor finishes can be added later.

Alfresco and patio

A new Non-Structural Slab question decides how the slab is priced. Leave it blank and the alfresco is priced as a structural slab, driven by the ground floor slab question the same as any other room. Answer 1 and it swaps to a tiled non-structural slab — a 100 mm smooth finish with tiles over it, plus a cold joint allowance along the wall it adjoins.

Tiles price on both slab types. The quantity is the alfresco area plus its outer perimeter edge, so the tile around the edge is already in the figure. For an exposed aggregate slab instead, zero the Tiles Included line and put a quantity against the exposed aggregate line.

Balcony and deck

A new Timber Decking question: leave it blank and the balcony is tiled, answer 1 and it is decked. Tiled runs the waterproofing and tile lines, with the quantity taken as the area plus the outer perimeter edge. Decking runs the Merbau 90x19. The sub-floor allowance switches between its balcony and deck versions on the same answer.

Home warranty insurance and long service leave

Two statutory costs now calculate themselves from the estimate rather than being worked out at the end and typed in:

Line Rate
Home Warranty Insurance / Domestic Building Insurance 1.1% of estimate cost
Long Service Leave 0.575% of estimate cost

Both sit under INSURANCES in Site Setup / Preliminaries, and both are percentage lines — they read the whole estimate rather than a takeoff. Add a room, change the spec level or adjust a rate and the two of them move with it, so there is nothing to revisit before the quote goes out.

If your rate differs, type over the percentage on the line.

Moving to Version 2

Version 2 applies to new estimates only. An estimate you have already started on Version 1 keeps its own formulas and is unaffected — finish it where it is and start your next job on Version 2.

For a new job, the order of work changes slightly:

  1. Answer the general questions at the top of the takeoff — new build or renovation, spec level, and the slab, joist, truss and wall height questions for each level.
  2. Tick which level each room sits on and enter its measurements.
  3. Go through each room's TEMPLATE ASSUMPTIONS block and override anything the job needs differently. This is the step that is new, and it is where the estimate is now controlled.
  4. Price as normal. Anything you zeroed will not appear.

Cost codes are set on every priceable line, so cost reporting and converting the estimate into a job will categorise correctly without any setup.

If something prices in a way you don't expect, check the room's Template Assumptions block first — nine times out of ten the answer is there rather than in the costings.