wunderbuild webinar
How to Use the Wunderbuild Feasibility Template to Price a Job in Under an Hour
Jacob Campbell • November 20, 2026


A feasibility estimate in Wunderbuild is built almost entirely in the takeoff tab. You answer a short set of setup questions, measure each room, and the template writes the costings for you — around 400 items respond to those answers in the background. For most residential jobs that's under an hour of work, and what comes out the other end is a 60-page itemised estimate with a price range your client can actually act on.
This is a written recap of our live member training session, where Jacob worked through a full feasibility estimate from blank plan to client-ready preview and answered questions from builders along the way.
Prefer to watch? The full session is above. Everything in it is written out below.
What this session covers
• Starting a feasibility estimate and loading your plans
• The one-for-yes setup questions and what each one controls
• Mid-range versus high-range spec, and what changes between them
• Measuring internal areas, external walls and internal walls without double-counting
• Where doors, external doors and stairs belong
• Template assumptions and how to override them on a renovation
• Handling a renovation and an extension in the same estimate
• Setting your global markup and the feasibility range
• Using your own labour rates through SKU matching
• Swapping a cladding spec without redoing a single takeoff
• Setting up the client preview and the allowances page
What a feasibility estimate is, and when you'd use one
A feasibility estimate is a priced range you give a client early, before anyone has committed to a full documentation set or a detailed quote. It sits between a square-metre rate scribbled on the back of a card and a full detailed estimate.
The square-metre rate is fast and nearly always wrong. A detailed estimate is accurate but costs you days of work, which is why most builders won't do one until the client is serious. The gap between those two is where jobs get lost — the client wants a number now, you can't justify the hours, so they go to whoever answers first.
A feasibility estimate closes that gap. It's built from real quantities off the plans rather than a rate, it carries a defensible range rather than a single number, and it takes under an hour once you know the process. You use it to qualify the lead: if the client's budget and the estimate are in the same postcode, you go to detailed. If they're not, you've found that out in an hour instead of two weeks.
Starting the estimate
From the estimations tab, click new estimate and select the Feasibility Template by Campbells Estimating. Go to the takeoff tab, upload your plans, and run a scale test on each page before you measure anything. That's standard estimating practice and it's the one step people skip that invalidates everything downstream.
If you're on an older version of the template, update it first. Settings, then asset marketplace, then manage assets under Campbells Estimating, and select the current version. Starting an estimate on a superseded version will show you a blank template with a prompt to add the new one, so you'll know immediately if you're behind.
The takeoff tab does the whole job
This is the part that makes the feasibility template different from a standard estimating template. It's built so you never have to pre-fill anything in the costings tab. Every question, every measurement and every spec decision is answered in the takeoff tab, and the costings populate themselves from your answers.
The only thing you do in costings is mark the rooms you didn't use as not used, so they don't appear in the client's document.
Most of the setup questions are one-for-yes. Open the item, click the calculator, type 1 if the answer is yes. Zero, or blank, is read as no.
That's the entire logic model behind the template.
If you want to see how takeoffs behave in Wunderbuild more generally — including measuring against a scaled grid page when there are no drawings at all — that's covered in our session on estimating a renovation without plans.
Mid-range and high-range spec
The spec question is the single highest-leverage answer in the template, because it moves several hundred items at once.
Mid-range assumes the finishes most volume and mid-market builders actually use — carpet to bedrooms, vinyl through the main living areas, standard fixtures. High-range assumes engineered timber flooring and the fixture and fitting levels you'd expect on an architectural job. Stair allowances, air conditioning and a long list of other items all shift with it.
High-range covers most architectural work. At the extreme end — genuinely high-end architectural homes — estimating gets difficult by any method, and a dedicated super-high spec setting is on the development list rather than in the template today. The two existing ranges cover around 95% of residential builders.
Air conditioning works the same way. Tell the template whether it's split systems or ducted, and it reads how many rooms you've measured and allows accordingly — a head per bedroom and living area for splits, or a sized allowance based on the floor area and number of levels for ducted.
Level questions are asked once, not per room
After the general questions you answer a short set per floor: new slab to the ground floor, new joists and bearers, new trusses, wall height. The second and third floors ask the same questions minus the slab.
These are deliberately asked once per level rather than once per room. When you later measure a wall perimeter in a bedroom, the template already knows that room is on the ground floor and that the ground floor wall height is 2.55m, so it calculates framing, lining and painting without asking you again. Keeping the question count down is why the whole estimate fits inside an hour.
There's also a short block of site-specific items — temporary fencing, power pole, engineering — and a site prep and demolition section for jobs where you're pricing the knockdown as part of the feasibility.
Measuring a room: go inside the internal walls
The most common question about the template is where the room area starts and stops. The answer: the area is the internal area, measured inside the internal walls.
You don't lose the wall structure by doing it that way. Calculators in the background add the square metreage of the walls you measure back into the slab area, and into the joist and bearer area if the room is on an upper level. Measure inside the walls and the structural quantities still come out right.
For rooms that aren't a neat rectangle, use the polygon tool. A practical tip from the session: leave the area shape visible while you move to the next room, so when you draw the adjoining room you can see exactly where the first one finished and butt the two together cleanly.
External and internal walls, without double-counting
Measure external walls along the outside face of the house. That single measurement drives the timber framing, plasterboard, skirting, architraves and painting for that wall.
Internal walls are the ones builders worry about, because a wall between a kitchen and a pantry gets measured twice — once in each room. Measure it in both rooms anyway. The template expects it. The framing calculation on internal walls is written to take roughly half the timber on each pass, so the framing doesn't double up, while the plasterboard, skirting, painting and architraves are counted on both faces, which is correct — both sides of that wall need lining and painting.
If you skip the second measurement to avoid what looks like a double-up, you'll under-order lining and under-price painting on every internal wall in the house.
Replacing wall linings on an existing wall
Renovations often leave a frame standing. There's a dedicated item for that: replace wall linings to existing walls.
Use it instead of the new internal or external wall item when the frame stays and only the lining changes. It picks up the plasterboard, painting and finishes without adding timber framing or the carpentry labour to build a wall that's already there.
Add doors once, to the room you're entering
Doors sit in the room list, which raises the same question as walls: both rooms, or one?
One. Adding a cavity slider in both the kitchen and the butler's pantry buys you two doors.
The rule that keeps it consistent across a whole house: add the door to the smaller room — the room you're entering. A pantry off a kitchen gets the door. An ensuite off a bedroom gets the door. Apply it the same way every time and you'll never have to think about it again.
Some rooms don't carry an external door option, because an external door there isn't typical and every extra question costs time. If your plan has one anyway — a door out of a study, say — go to lockup works, then external windows and doors, and add an additional external hinged door at the bottom. Front doors carry a higher allowance than a laundry or garage door, so select the right one.
Stairs: never on both floors
Stairs are built into several rooms, including entries and living rooms. Add them once.
Adding stairs on the lower floor and again on the upper floor gives the client two sets of stairs — roughly $40,000 of allowance for one flight. The allowance also moves with your spec selection, so a high-range job carries a higher stair cost automatically.
On the upper level, treat the stairwell as a void. Measure around it rather than through it, but still pick up the external wall running around that space.
Garages
Garages work like any other room: internal area, external walls, internal walls. Cabinetry is in there too, because so many builders put a laundry or a linen run in the garage. The external door items are the one difference — single and double garage door options sit alongside the standard hinged door.
Don't lump items into one room to go faster
It's tempting to tally every cupboard in the house into one room and move on. The quantities will be right and the total will be right.
The client document won't be. Every item lands in the room category you measured it in, so lumping fifteen cupboards into the kitchen gives you a kitchen that looks wildly expensive and a bathroom with no cabinetry in it. When you sit in front of the client and walk them through the breakdown room by room — which is the whole point of handing them a 60-page document — the numbers have to make sense per room.
Walls have to be measured correctly regardless, because they're tied to the room they're in.
Template assumptions, and how to override them
Template assumptions are a set of visible items telling you what the template has decided in the background. A line saying a slab has been included to the kitchen, for example.
You don't have to touch them. They're there so you can see what's happening rather than guessing, and so you can override it when the job doesn't match the assumption.
The override is simple. Open the calculator on the assumption, zero it out, and accept. If the kitchen sits on an existing slab in a renovation, zeroing the slab assumption removes the slab cost from that room and the pricing adjusts automatically.
Renovation and extension in the same job
This came up directly in the session, and it's the question that drove the assumptions feature.
You still select either new build or renovation, not both. For a renovation with an extension, call the project a renovation. Then answer the level questions for the new work: if there's a new slab to the extension, say yes. If there are new joists and bearers, say yes.
That would normally allow a slab under every room. The assumptions are how you claw it back. Go into the existing-area rooms and zero out the slab assumption room by room. The extension keeps its slab, the existing rooms don't, and you get both halves of the job priced correctly in one estimate.
Work in the right order, or you'll wait
There's a lot of data moving through this template, and Wunderbuild recalculates the costings every time you open that tab. On a full job it can take 20 to 30 seconds to load.
So don't ping-pong. Complete the entire takeoff tab, then move to costings once. Measure, check the cost, measure, check the cost, and you'll spend more time watching a loading spinner than estimating.
The takeoff tab itself also takes a moment to load the data in. Give it a second before you start drawing, so you don't lose measurements you've already made.
What you can still change in the costings
The template is designed so you don't need to open costings. It's not locked, though — if something on the job is unusual, you can change it.
You can add line items, import categories from another template (your vehicle allowance category, for example, via options then import from template), and edit any price. The items with a green marker on the left are assemblies and recipes, with everything built into them.
Editing a price is the most common change. If your client has specified a $1,200 toilet suite and the template is allowing $681 excluding GST, change it to $1,090 excluding GST and update. That flows straight through to the estimate and the client's document.
One warning worth taking seriously: don't delete takeoff items, and don't delete the formulas inside the calculator boxes. The formulas are what read your answers and drive the costings. Delete one and updates stop flowing through for that item, silently, for the rest of the job.
Using your own labour rates
If you've already built a custom price list for the Detailed Builders Template, it works here too. The item codes in the feasibility template match the detailed template, so tick use my prices and your carpentry labour rates drop straight into the feasibility estimate in place of ours.
SKU matching is what makes that work. Your rates sit inside the template's existing structure rather than beside it.
Labour and a handful of simple default prices are worth customising. Going through and overriding hundreds of material prices usually isn't — that's what the maintained price list is for.
Swapping a spec without redoing the takeoff
This is the section to read twice, because it's where the template saves you an afternoon.
External wall finishes are driven by a question block: brick finish, or cladding — and within cladding, Axon, BS Linear Board at 150 or 180, or Primeline. Underneath sit the follow-up questions for battening, stone cladding and trim options.
If the job comes back over budget and you want to re-price it in chamferboard instead of linear board, you don't touch a single takeoff. Open the question, type 1 against chamferboard, update, then zero out the linear board. The pricing swaps across the whole estimate and your measurements stay exactly where they are.
Give it a few seconds to recalculate in the background before you check the result.
Setting your markup and the feasibility range
A feasibility estimate should give the client a range, not a false single number.
Under options, edit global markup. The recommended setup is 25% with the feasibility range enabled. The range adds 8% on each side, which compounds to roughly 10% once markup is applied on markup, so the client sees a band from about 25% to about 35%.
The part that catches people out: the range builds upward from your markup. Your markup is the bottom of the range, not the middle. So if your real markup is 30% and you want it sitting mid-range, set the global markup around 25% and let the range carry it up. Deduct roughly 5% from your standard markup to centre yourself.
If you'd rather present a single price, disable the feasibility range and the template behaves like a standard estimate at your set markup.
Naming rooms and hiding the ones you didn't use
Room names only matter in the costings tab — that's what flows through to the client document. Rename the categories to match the plan: entry/mudroom rather than hallway/mudroom 1, if that's what the drawings call it. Takeoff tab names don't need touching.
Then mark every room with zero cost as not used. If there's no second ensuite on this job, the client shouldn't see an empty ensuite heading in their document.
Setting up the client preview
The preview is what the client actually receives, and it has its own setup.
Open customise, select the Campbells Feasibility template from the dropdown, then reset template defaults, save and close. That applies the preview configuration built for this template to your estimate.
What comes out is a document broken down by room and by trade heading, with set-up and preliminaries, timber framing, insulation, wall and ceiling linings, flooring, waterproofing and tiling, cabinetry, plumbing, electrical — all populated from your takeoff. You can show or hide quantities depending on how much you want to reveal.
And that's the point of it. Your competitor sends a three-page letter with a range and a short inclusions list. You send 60-odd pages showing exactly what's in the number and how it was built, the day after the meeting. There's a step-by-step walkthrough of the preview setup in the Feasibility Template course, which is free to members.
Allowances and PC sums
The preview includes an allowances section broken down per room — the kitchen sink at $780, for example.
Quote PC and PS allowances excluding markup. That's the figure the client can genuinely spend at the supplier, and it's what the template is configured to show. The markup on those items is redistributed across the rest of the estimate rather than buried in the allowance, so your margin is intact and the client's selection budget is honest. Both of those matter when they come back three months later having spent $1,400 on a sink.
What's not in the template yet
Two things came up in the session as development items rather than features:
Raked ceilings. There's no raked ceiling input today, so extra wall height above the standard level height isn't picked up automatically. It's on the development list. The challenge is adding it without adding half a dozen questions per room, which is the thing that would turn an hour-long feasibility estimate into a detailed one.
Default takeoff colours. Setting a fixed colour per item type — internal walls always one colour, sliders always another — so you can see at a glance which rooms you've finished. On the list for a future version.
In the meantime, use the visibility toggles. The eyeball icon beside each measurement group hides and shows it, and selection mode at the top lets you select all takeoffs and show or hide the lot. Measuring all the walls in the house in one pass with everything else hidden is faster and easier to check than working room by room through a plan covered in colour.
The template is developed continuously from builder feedback — around 780 hours of development went into the first release, and most changes since have come straight from questions like the ones in this session.
Common mistakes
- Measuring room areas outside the walls. The template expects internal areas and adds the wall structure back in itself. Measure outside and you'll double up.
- Skipping the second internal wall measurement. It looks like a double-up. It isn't — the framing is halved automatically and the linings and painting need both faces.
- Adding a door in both rooms. Add it once, to the room you're entering.
- Adding stairs on both levels. That's a second flight, and roughly $40,000, in a number you're about to hand a client.
- Lumping items into one room. The total is right, the room breakdown is wrong, and the room breakdown is what you present.
- Checking costings after every measurement. Finish the takeoff tab first. One load instead of forty.
- Deleting a formula from a calculator box. It stops that item updating from your takeoffs, and nothing tells you it's happened.
Get the template
The Feasibility Template is included with the Detailed + Feasibility package, and every subscriber gets free training, free support and every update as it's released.
If you'd rather not build feasibility estimates yourself, our team will build them for you inside your own Wunderbuild licence — see the Feasibility Estimating Service.
Already a member? One-on-one training with Alvin, our senior estimator, is unlimited and included. Book a session any time.
Ready to quote faster?
Book a free 15-minute call with our team and we'll show you how Campbells fits your workflow.
Book a Free CallLatest Posts



